In recent years, because of the resource of forest have been lessened and the environmental protection dominating, the furniture materials use more laminated panels (such as plywood, particle board, MDF and etc.) to instead of solid wood.
The panels have different specification for every processing demand, which through surface laminating, cutting, edge banding, boring and etc…become different kinds of K/D (knock down) panels furniture.
The OA furniture is one of the K/D furniture representative, it includes the office table, computer table, desk, files cabinet and etc…That have two separate production lines including table top and cabinet lines.

General Processing Information

   



Process Description
   


Plant Description
Machines and Equipments 


NO
DESCRIPTION
POWER
UNIT
APPLICATION
1.         Panel Sizing Section
01
Panel Saw
13 HP
1
Panel cut to size
02
Auto. Panel Saw
14 HP
1
Panel cut to size
03
Hydraulic Table Lifter
2 HP
1
For panel loading
2.         Planning Section
01
Single Spindle Shaper
5 HP
1
Edge profiling
02
High Speed Router
5 HP
1
Profiling & grooving
03
Double End Tenoner
28 HP
1
Panel sizing & profiling
3.         Edge Banding Section
01
Edge Banding M/C, Manual
3 HP
1
For edging free shaped panel
02
Edge Trimming M/C
1.5 HP
1
Top & bottom edge trimming
03
Radius Trimming M/C
1 HP
1
Corner round trimming
04
Edge Banding M/C, Linear Series
10 HP
1
For edge banding 0.4 – 3 mm thick PVC or melamine edging
05
Edge Banding M/C, Soft forming
20 HP
1
For soft forming edge
4.         Boring & Jointing Section
01
Vertical Drilling M/C
10 HP
1
Making connecting holes
02
Horizontal + Vertical Boring M/C
8 HP
1
Making connecting holes
03
Hinge Inserting M/C
1.5 HP
1
Hinge hole boring & hinge inserting
04
Point to Point Machining Center
15 HP
1
Making shelving holes, groove and shank hole routing

   

Production Capacity 
Regarding OA Furniture produce line, the production capacity is about 700 sets / day for computer table or 600 sets / day for office table.

Manpower Requirement


Section
Manpower
(Member)
Plant Manager
1
Production Technician
2
Foreman
2
Panel Sizing
4
Planning
2
Edge Banding
7
Boring & Jointing
6
Table Top Making
8
Peripheral
3
General Worker
4
TOTAL
39



Electricity Power Requirement

Section
Electricity Power
(HP/KW)
Panel Sizing
29 / 21.75
Planning
38 / 28.5
Edge Banding
49 / 36.75
Boring & Jointing
34.5/25.88
Table Top Making
64 / 48
Peripheral
31.5 / 23.63
TOTAL
246 / 184.51

REMARK: Electricity Power for 220V/3Ph/60Hz

Total Budget An OA Furniture produce line, the total budget of equipment from US$150,000 to US$600,000, depending on different product and capacity.

Installation Charge Please note that the installation charge covering as follows will be at buyer’s account if require maker to install M/C at buyer’s factory.
●Round trip air ticket charge
●Lodging & catering charge
●Engineer’s labor cost: US$200/day/person
(including traveling hours)

Limited Warranty All products sold are warranted against defects in workmanship or materials under normal use (rental service excluded) for one year. However, the electric and pneumatic parts are warranted for three months.Liability in all events is limited to the purchase price paid and liability under the aforesaid warranty is limited to replacing or repairing any parts which are defective in materials or workmanship and returned to our branch or an authorized service station as we designate, shipping costs prepaid.

Suppliers Information Company Name: Technik Associates, Inc.
Address: 288, Sec.2, Tanfu Road, Tantzu Hsiang, Taichung, Taiwan
Tel:             886-4-25349000      
Fax: 886-4-25349160
E-mail: technik@ms14.hinet.net
http:// www.hipoint.com.tw



No comments:

Post a Comment

START A BUSINESS OF HERBAL LASSI

START A BUSINESS OF HERBAL LASSI INTRODUCTION Lassi, as such has very good nutritional value. Lassi is considered to be even b...